Building Statistics

General Building Information

Building Name

Location and Site

Occupant Name

Occupancy Type

SUNY Potsdam Performing Arts Center

SUNY Potsdam Campus |  44 Pierpoint Ave, Potsdam, NY 13676

Department of Theatre and Dance, The Crane School of Music

Non-Separated Mixed Use

Building Size

97,000 square feet

Number of Stories

3 Stories (2 Above Grade, 1 Below)

Delivery Method

CM Agency with Multiple Primes

Dates of Construction

April 2011- January 2014

Overall Project Cost

$55,000,000

Building Design Team

Architect

Landscape Architect

Pfeiffer Partners Architects, Inc.

Environmental Design & Research

Structural Engineer

Wayman C. Wing Consulting Engineers

MEP Engineer

M/E Engineering, P.C.

Lighting Consultant

Horton Lees Brodgen Lighting Design

Acoustic Dimensions

Shumaker Consulting Engineering

Fisher Dachs Associates

Theater Consultant

Acoustics/AV

Civil Engineer

Project Management

Cost Estimator

Client

Gilbane Building Company

VJ Associates

State University Construction Fund

Figure 1 | Building Location at SUNY Potsdam Campus

Figure 2 | Programmatic Diagram of SUNY Potsdam Campus Section

Project Building

Academic Building

Student Housing

Performance Venues

On-Campus Parking Lots

For more information on the building's primary engineering and supporting systems, check out Building Statistics Part 2 by clicking here

Note: While great efforts have been taken to provide accurate and complete information on the pages of CPEP, please be aware that the information contained herewith is considered a work‐in progress for this thesis project. Modifications and changes related to the original building designs and construction methodologies for this senior thesis project are solely the interpretation of Luis Carrasquillo-Alicea. Changes and discrepancies in no way imply that the original design contained errors or was flawed. Differing assumptions, code references, requirements, and methodologies have been incorporated into this thesis project; therefore, investigation results may vary from the original design.

TELL YOUR STORY

Fall 2017

Assignment News Feed

12.08.2017 - Senior Project Proposal Part 2 Due

12.08.2017 - CPEP Review / Proposal Posted on CPEP

12.01.2017 - Lutron Presentation

11.17.2017 - Breadth Topic Proposal Due

11.17.2017 - Tech Report 3 Due

Spring 2018

Assignment News Feed

04.23.2018 - SARI Workshop

04.20.2018 - Placement and Salary Survey Due

04.20.2018 - Final Reflection Due

bottom of page